Key facts for Turkey buyers, as of October 2026

— Turkey’s Ministry of Trade says old and used goods are subject to permission.

— The machine’s 12-digit GTİP decides which permit route needs to be established.

— Customs-value guidance distinguishes a buying commission from other commission and brokerage.

— Some product-inspection cases require an approved EU declaration of conformity.

— The live sailing and acceptance of the exact machine remain booking-specific.

— Registration and road-use requirements depend on the machine and its intended use.

The importer’s customs broker, the relevant Turkish authority and the forwarder must settle the machine-specific route before payment or booking.

What must I know before buying used machinery for Turkey?

Four decisions shape the purchase: who imports the machine, how it is classified, which used-goods permission route applies and which product rules reach it. As of October 2026, Turkey’s Ministry of Trade says old, used, renovated, faulty and obsolete goods are subject to permission. That makes eligibility part of the buying decision, not a task to leave until arrival.

The broad machine family is not enough. The permit reference depends on the 12-digit GTİP and whether that line follows the listed or off-list route. The same exact line also drives the duty, additional duty and import-tax treatment. A familiar model name cannot supply those answers.

Age, unit value and admissibility cannot be carried across from another excavator, tractor or forklift. Product inspection creates another separate gate. The position of the particular used machine, including its engine and emissions treatment, remains open until the responsible Turkish bodies identify the applicable procedure.

Before the route is fixed, the machine record needs its make, model, serial number, manufacturing evidence, intended work and seller documents. A pre-purchase machinery inspection can keep the condition decision separate from import eligibility.

The sequence also protects the seller negotiation. A buyer can see whether a missing permit answer, product document or origin record could change the choice before freight enters the discussion. It keeps the commercial conversation tied to the actual unit and avoids treating a familiar model name as a substitute for evidence.

We’d put the plate photograph at the front of that record; the Turkish importer’s customs broker must check the 12-digit GTİP, permit route and current statutory treatment with the Ministry before the buyer commits.

Does a used machine need a Turkish import permit?

As of October 2026, Turkey subjects old and used goods to permission, but the machine’s 12-digit GTİP determines the applicable route. A broad equipment description cannot establish its annex line, age or value condition. We’d pause the purchase until the importer’s broker checks that exact line; the detailed steps are in our Turkey used-machinery import permit guide.

How do origin and customs value affect a machinery import?

The place where a machine is advertised is not the same as its preferential status. As of October 2026, the EU–Türkiye customs union removes customs duties and quotas for goods within its covered scope. An EU yard address alone does not show that the machine qualifies.

Free-circulation evidence, origin and any additional-duty consequence remain machine-specific. This matters when two similar machines sit in different yards: the documentary route can differ even when their specifications look alike. The exporter’s evidence therefore belongs beside the serial number and invoice, not in a separate generic file.

Turkey’s customs-value guidance draws a specific line around buying commission. It excludes a buying commission but adds other commission and brokerage. Packaging and the cost of transport, loading and insurance to the point of entry are also added when they are not already included.

The exchange rate is the Central Bank of the Republic of Türkiye selling rate on the date the customs liability arises. That date is part of the declaration calculation, rather than a rate that can be locked into an early buying estimate.

Free-circulation evidence answers a customs-status question, while origin evidence answers a preference question. The two can travel together in the seller file without becoming interchangeable.

We’d compare origin papers before comparing headline prices; the exporter and the Turkish customs broker must check the machine’s free-circulation evidence, origin treatment and customs-value components.

Which conformity and TAREKS checks apply to used machinery?

As of October 2026, Turkey’s 2026 product-inspection procedure contains firm document rules, but it does not put every used machine through one identical route. Where that procedure requires an EU declaration of conformity, the Ministry guide says the declaration must be approved by the Turkish commercial counsellor or attaché.

A physical-inspection selection brings its own timetable. Under the same procedure, the Annex 3 documents are uploaded to TAREKS within 20 business days of the application. Test reports and the declaration of conformity must be dated on or before the transport document.

The open question comes first: it is not settled whether the particular used machine falls within the relevant product-inspection communiqué. Its engine and emissions treatment are also unresolved. A plate, a CE mark or an old declaration may be evidence, but none of them alone answers which Turkish procedure applies.

A seller check can run alongside this work. Our guide to spotting a machinery scam sets out practical context when the advert or trading history is unfamiliar.

We’d read the declaration against the plate before discussing freight; the broker, Turkish Standards Institution and Ministry of Industry and Technology must check the product-inspection, engine and emissions route for the actual machine.

Does the machine need cleaning, plant-health or packaging evidence?

The plant-health position is not settled for a particular used farm, forestry or ex-farm machine. Certificate scope and any additional soil-free declaration remain machine-specific rather than rules that can be applied to every unit. Construction work alone does not resolve the earlier-use question either.

The machine’s work history is therefore part of the import file. A short account of where it worked and what it carried gives the authorities something specific to assess. Photographs can show condition, but they do not replace the route-specific certificate decision.

Wood packaging has a clearer rule. As of October 2026, Turkey’s official filing requires regulated wood packaging to receive heat treatment and the prescribed mark under ISPM 15. Pallets, skids and braces can sit within that packaging question even though they are not part of the machine.

We’d make cleaning visible in the inspection record; the Agricultural Quarantine Directorate, the GB Animal and Plant Health Agency and the buyer’s broker must check certificate scope, wording and packaging evidence before loading.

How should freight, customs filing and registration be planned?

Transport planning begins with the mode and voyage category. Summary-declaration deadlines differ between them, so an undated rule of thumb cannot be applied to every booking. The relevant start event and filing responsibility depend on the movement that is actually selected.

Sailings run as of October 2026, but the schedule, route and acceptance of a particular machine remain operational. A carrier’s general service page does not amount to acceptance of a machine’s dimensions, weight or loading needs.

Registration is a separate handover. Turkey’s rules assign agricultural-sector work machines to the chamber of agriculture and other work machines to the chamber of commerce or industry. The complete first-registration documents, deadline and road-use permission are not uniform enough to carry from one machine to another.

The UK export side also needs its own record. A UK seller may zero-rate only when its conditions and evidence requirements are met. UK exporter guidance names Türkiye and heavy machinery, including excavators, in sanctions-circumvention risk guidance, so end user, end use, destination and machine evidence matter.

We’d choose the route only after the machine is measured; the forwarder, carrier, relevant chamber, highways authority and Turkish broker must check the live booking, filing, registration and road-movement plan.

Pre-purchase checklist

As of October 2026, before you commit to used machinery for Turkey:

— Name the Turkish importer and appoint its customs broker.

— Obtain the exact 12-digit GTİP and the written used-goods permit route.

— Put origin and free-circulation evidence against the machine’s serial number.

— Record buying commission, other brokerage, packaging, transport, loading and insurance separately for valuation.

— Collect the declaration of conformity, test reports, plate details and transport document dates.

— Record farm, forestry or ex-farm use and settle plant-health scope before loading.

— Check every regulated timber pallet, skid or brace for ISPM 15 treatment and marking.

— Obtain written unit acceptance, the filing responsibilities and the current schedule from the forwarder.

— Settle the chamber-registration and road-use route before delivery terms are chosen.

— Agree the seller’s export evidence and complete end-user and end-use checks before payment.

We’d run one final serial-number review so the permit, product, origin, freight and registration answers all refer to the same machine.

Working with a buying agent who already does this

Euro Plant Finder works on the sourcing and export side. We find used machinery in Britain and Europe, check the seller, arrange inspection and coordinate the available identity, condition and export documents with the freight parties.

The buyer’s own Turkish customs broker classifies the machine, makes the import declaration and clears it. Turkish authorities decide permission, product inspection, plant health and registration. That boundary keeps the import decision with the professionals who represent the buyer in Turkey.

Our buying-agent comparison covers the work and risk involved in independent representation and buying direct. We’d keep one shared machine record so the seller, broker and forwarder work from the same identity and evidence.

Sourcing for Turkey?

Tell us the machine type, spec and budget. We find it, inspect it, check the seller and get the export side documented for your clearing agent — working only for you, no fee unless we complete the deal.

Tell us what you're looking for →

Want the import checklist to keep?

Download the free import checklist →

Frequently asked questions

What is the import duty on machinery in Turkey?

As of October 2026, there is no safe machine-wide rate to quote. The Turkish importer’s broker needs the exact 12-digit GTİP, while origin and the evidence for any covered EU–Türkiye customs-union treatment remain machine-specific. Duty, additional duty and import-tax treatment can follow different measures. The broker must check the live tariff line and the exporter’s evidence before the buyer relies on a rate.

Is there a free trade agreement between the UK and Turkey?

The existence of a trade arrangement does not make every machine bought in Britain preferential. As of October 2026, the exact 12-digit tariff line, the machine’s qualifying origin and acceptable proof still decide the treatment. The UK seller’s export-VAT evidence is a separate question. The exporter and Turkish customs broker must check origin, proof, customs measures and the seller’s evidence terms for the selected machine.

What can’t you bring into Turkey?

For used machinery, a broad prohibited list would be misleading. As of October 2026, Turkey subjects old and used goods to permission, and the exact 12-digit GTİP determines the machine-specific permit route. Age, unit-value and admissibility conditions cannot be assumed from the equipment family. Product-inspection, engine and emissions treatment may also remain open. The importer’s broker and relevant Turkish authority must decide the actual machine’s route.

Does used farm machinery need a phytosanitary certificate for Turkey?

As of October 2026, the machine-specific answer is not settled. Certificate scope and any additional soil-free declaration remain machine-specific rather than rules that apply to every used farm, forestry or ex-farm machine. Regulated wood packaging does require ISPM 15 heat treatment and marking. The Agricultural Quarantine Directorate, the exporting plant-health authority and the buyer’s broker must check the machine’s scope, certificate wording and cleaning evidence.

How do I ship heavy machinery from the UK to Turkey?

As of October 2026, sailings run, but the current route, schedule and acceptance of a particular machine are booking-specific. Summary-declaration timing also depends on the mode and voyage category. Exporter guidance makes end user, end use and destination evidence relevant for heavy machinery. The forwarder, carrier and Turkish customs broker must check written unit acceptance, the filing event, the live schedule and the export-side evidence before booking.

Can Euro Plant Finder handle the Turkey customs side?

No. Euro Plant Finder handles sourcing and the export-side coordination. We can find the machine, check the seller, arrange an inspection and pass the available identity, origin and export documents to the freight parties. The buyer’s own Turkish customs broker makes the import declaration and clears the machine. Turkish authorities decide permission, product inspection, plant health and registration. We keep the seller and forwarder aligned with the information those advisers need.

Sources and last check

This guide was last checked on 26 October 2026 against the official sources below. It is general guidance, not a quotation or legal advice: rates and rules change, so confirm anything that affects your machine with your clearing agent or the authority named.

— Republic of Türkiye Ministry of Trade — Used-goods permit — checked 23 October 2026.

— Republic of Türkiye Ministry of Trade — Customs value and exchange rate — checked 23 October 2026.

— Republic of Türkiye Ministry of Trade — Summary declaration times — checked 23 October 2026.

— Republic of Türkiye Ministry of Trade — Product inspection guide (2026) — checked 23 October 2026.

— European Commission — EU–Türkiye customs union — checked 23 October 2026.

— International Plant Protection Convention — Regulation on heat treatment and marking of wood packaging materials — filed 12 March 2025; checked 23 October 2026.

— Union of Chambers and Commodity Exchanges of Türkiye — TOBB rules — checked 23 October 2026.

— HMRC — HMRC Notice 703 — checked 23 October 2026.

— GOV.UK — gov.uk exporter guidance — updated 12 March 2026; checked 23 October 2026.

Related guides